Time: 2006
Location: Baoding, Hebei
Capacity: 300KW
Installed area: 4111㎡
Project Characteristics:
The first BIPV project applied in a five-star hotel in the world. The power generation circuit board is consistent with the overall black and gray style of the building with the high light rate, unique installation structure, quick installation, convenient maintenance, no structural glue design making the whole building beautiful and generous.