◇ DC Intelligent Microgrid System
The First Ultra-low Energy Building in Shanxi Province
Three-star Green Building
Prefabricated AAA Standard Green Energy-saving and Environmentally Friendly Building
Time: 2021
Location: Taiyuan, Shanxi
Capacity: 94.1KW
Installed area: 765㎡
Project Characteristics:
The Colored Glazed·Colorful series products are applied to the roof of the building. The project can achieve a self-sufficiency rate of 100% of the energy consumption of building lighting. And combined with the 220V/ 150KW DC bus microgrid system, 48V lead carbon energy storage system 48 KW and the 30kw DC lighting system,it is a technologically first-class DC intelligent microgrid system.
Energy Saving
The average annual power generation of the project reaches 144,000 kWh, which is equivalent to reducing carbon dioxide emissions by 143 tons.