◇Structure-Hidden Frame Structure◇
National Two-star Green Building
▪The first batch of CCER projects registered by the state
Time: 2012
Location: Tianjin, China
Capacity: 66KW
Installed area: 800㎡
The hign light transmittance, high efficiency, safety, environmental protection and strong compression resistance BIPV design, which fully meets the requirements of project construction. The project is the first smart grid energy station in the country to realize the intelligent coupling and efficient utilization of multiple energy technologies. It has renewable energy technologies such as ground source heat pump and photovoltaic power generation, and four major energy-saving technologies such as water storage and gas triple supply. It realizes the fully efficient scientific coupling of renewable energy, clean energy and traditional energy.
Energy Saving
The multi-energy technologies used in the building can provide cooling and heating for about 240,000 square meters of public buildings in the animation park, saving 1,904 tons of standard coal, 4,971 tons of carbon dioxide emissions, 46 tons of sulfur dioxide emissions, and 10,000 tons of water every year.