Time: 2017
Location: Changchun, Jilin
Capacity: 175KW
Installed area: 1006㎡
Project Characteristics:
BIPV is connected with the surrounding curtain wall through a special structure, and the waterproof pipeline is pre-embedded in advance, which is simple and inexpensive to construct. While ensuring power generation, it is sturdy and durable, thermal insulation, waterproof and moisture-proof.