Time: 2022
Location: Shanghai, China
Capacity: 171KW
Installed area: 1112㎡
Project Characteristics: The BIPV is specially designed to couple with the external protection system, equipment and pipeline system, also with built-in system design. The system is of good quality and has a high degree of standardization, which reduces the waste of materials during the construction process, as well as the generation of construction pollution such as dust, noise and other construction waste on the construction site. At the same time, it is more than 30% shorter than the glass construction method installation, which truly realizes material saving, energy saving, labor saving and carbon emission reduction.
Energy Saving: 117,200 kWh power generation, which is equivalent to reducing carbon dioxide emissions by 116.85 tons, saving 46.88 tons of standard coal, reducing dust emissions by 31.88 tons and sulfur dioxide by 3.52 tons.